ABOUT THIS PROJECT
The Lemon Gulch – Avalon Bay project is a collaborative drainageway improvement led by the Mile High Flood District and the Town of Parker, with design provided by Muller Engineering Company and construction performed by Naranjo Civil Constructors. The project delivers critical channel stabilization improvements for future development within the Lemon Gulch watershed. The work includes full channel realignment, grading, and the construction of multiple drop structures and energy dissipation features to reduce long-term erosion, protect public infrastructure, and improve water quality. The project also includes riparian corridor restoration, native seeding, and slope stabilization to support long-term ecosystem function and regulatory compliance. The construction is carefully phased to coordinate with active development and ongoing utility work adjacent to the site.
CLIENT
Mile High Flood District
LOCATION
Parker, CO
WATCH NOW
PROJECT SHOWCASE VIDEO
From a bird’s-eye perspective, you can see the incredible work being carried out by Naranjo Civil Constructors on-site. With a commitment to environmental restoration and construction excellence, our team is transforming the landscape while ensuring the highest standards of quality and sustainability.
PROJECT EVOLUTION
Experience the progress first-hand with our interactive image comparison slider. Seamlessly switch between before-and-after views to see the impactful changes made on-site, highlighting the transformation and precision of our work.”
















