– PROGRESS UPDATES AND USEFUL CONTENT OF YOUR PROJECT SITE –

BIG DRY CREEK: REACH 12

Naranjo Civil Constructors is partnering with SEMSWA on the Big Dry Creek: Reach 12 project to provide adequate cover over the two existing sanitary sewer crossings, protect against future erosion, and to stabilize eroding banks.

– CAD OVERLAYS –

HI-RES CAD IMAGE DOWNLOAD

– BDC: REACH 12 PROGRESS BEFORE/AFTER –

In these photos, we cover progress that has been made on site.

– BDC: REACH 12 PROGRESS BEFORE/AFTER (PREVIOUS WEEKS) –

In these photos, we cover progress that has been made on site in past weeks.

– VIDEO STREAMS –

– JOBSITE PICTURES –

June 30th, 2021