Project Details

About This Project

Westminster and MHFD have big plans for streambank stabilization along Big Dry Creek. BDC will be reconstructed between 104th Avenue and Sheridan Boulevard.

This project will include trail extensions and realignments to improve flow and trail access.

Westminster and MHFD have selected a project partnership team to get the job done:

  • Olsson is the design engineer
  • Stream Landscape Architecture is providing landscape architecture services
  • Naranjo is the Civil Constructor
  • Western States Reclamation will be providing the landscape restoration

Westminster has more background information at their project websites:

Project Details

Stabilizing the channel and addressing eroded banks

Reestablishing river sinuosity

Imrpoving water quality and habitat

Improving the trail system throughout City Park

Major Work Items

Stabilizing the channel and addressing eroded banks

Reestablishing river sinuosity

Installation of void-filled riffle structures

Trail relocation and new pedestrian bridges

PROJECT SHOWCASE VIDEO

Weekly Project Progress Video.

PROJECT SHOWCASE VIDEO

Weekly Project Progress Video.

CAD OVERLAY

Engineer’s project designs overlaid onto current site conditions.

CAD OVERLAY

Engineer’s project designs overlaid onto current site conditions.

View Now

PROGRESS BEFORE / AFTER

Visualize the differences that have taken place on site.

PROGRESS BEFORE / AFTER

Visualize the differences that have taken place on site.

Phase I

Phase I

PreCon
07/08/2025

Phase II

Phase II

PreCon
07/08/2025