Westminster and MHFD have big plans for streambank stabilization along Big Dry Creek. BDC will be reconstructed between 104th Avenue and Sheridan Boulevard.
This project will include trail extensions and realignments to improve flow and trail access.
Westminster and MHFD have selected a project partnership team to get the job done:
- Olsson is the design engineer
- Stream Landscape Architecture is providing landscape architecture services
- Naranjo is the Civil Constructor
- Western States Reclamation will be providing the landscape restoration
Westminster has more background information at their project websites:
Project Details
Stabilizing the channel and addressing eroded banks
Reestablishing river sinuosity
Imrpoving water quality and habitat
Improving the trail system throughout City Park
Major Work Items
Stabilizing the channel and addressing eroded banks
Reestablishing river sinuosity
Installation of void-filled riffle structures
Trail relocation and new pedestrian bridges
PROJECT SHOWCASE VIDEO
Weekly Project Progress Video.
PROJECT SHOWCASE VIDEO
Weekly Project Progress Video.
CAD OVERLAY
Engineer’s project designs overlaid onto current site conditions.
CAD OVERLAY
Engineer’s project designs overlaid onto current site conditions.
View CAD Overlay
View Now
PROGRESS BEFORE / AFTER
Visualize the differences that have taken place on site.
PROGRESS BEFORE / AFTER
Visualize the differences that have taken place on site.
Phase I
Phase I
Phase II
Phase II
MEDIA LIBRARY
JULY 8th, 2025
MEDIA LIBRARY
JULY 8th, 2025






9 / 9