The Cherry Creek at Scott Road project is a significant endeavor led by Douglas County and the Mile High Flood District (MHFD), with Naranjo Civil Constructors as the prime contractor, Muller Engineering as the design engineers, and Western States Reclamation handling revegetation. This project focuses on creek restoration and floodplain mitigation to enhance ecological health and community accessibility. Spanning from Scott Road upstream, the initiative addresses flood control, channel stability, and habitat improvement. By improving drainage capacity and mitigating flood risks during major precipitation events, the team aims to protect the community and promote a healthier environment. This collaborative effort underscores a commitment to sustainable infrastructure, public safety, and environmental stewardship, ensuring long-term benefits for the local community. The Cherry Creek at Scott Road project is primarily a stream restoration effort that aims to enhance the natural flow and stability of the channel. Key improvements include the creation of riffles and careful grading to re-establish the creek’s natural contours, alongside vegetation enhancements to stabilize the banks and improve the overall ecosystem.

Project Details

Stabilizing the channel and addressing eroded banks

Reestablishing river sinuosity

Imrpoving water quality and habitat

Improving the trail system throughout City Park

Major Work Items

Stabilizing the channel and addressing eroded banks

Reestablishing river sinuosity

Installation of void-filled riffle structures

Trail relocation and new pedestrian bridges

PROJECT SHOWCASE VIDEO

Weekly Project Progress Video.

PROJECT SHOWCASE VIDEO

Weekly Project Progress Video.

CAD OVERLAY

Engineer’s project designs overlaid onto current site conditions.

CAD OVERLAY

Engineer’s project designs overlaid onto current site conditions.

View Now

PROGRESS BEFORE / AFTER

Visualize the differences that have taken place on site.

PROGRESS BEFORE / AFTER

Visualize the differences that have taken place on site.