DIP Projects - Responsive Gallery

DIP PROJECTS

Castle Pines, CO

Newlin Gulch

Parker, CO

Brandy Gulch

Sterling Ranch, CO

Sterling Gulch Peak Shaving

Parker, CO

Lemon Gulch Lookingglass

Parker, CO

Green Acres Trib

Sterling Ranch, CO

Willow Creek Sterling

Parker, CO

Lemon Gulch Meadowlark

Sterling Ranch, CO

Sterling Gulch

Sterling Ranch, CO

Willow Creek Rampart

Newlin Gulch

Developer

Shea Homes

Design Engineer

Muller Engineering Company

Contract Value

$6,007,846

Completion Date

May 2020

Scope Highlights

Grading, shaping, and stabilization of Newlin Gulch channel through "Canyons" development. Bank armoring and native revegetation to protect adjacent infrastrusture.

Brandy Gulch

Developer

Looking Glass

Design Engineer

Muller Engineering Company

Contract Value

$796,246

Completion Date

April 2021

Scope Highlights

Channel grading and stabilization upstream of Lemon Gulch. Pedestrian and bike crossing integrated with channel improvements. Riparian restoration to protect adjacent development and infrastructure.

Peak Shaving

Developer

Sterling Ranch Community Authority Board

Design Engineer

Matrix Design Group

Contract Value

$1,881,418

Completion Date

May 2022

Scope Highlights

Mass excavation and installationg of large box culvert. Construction of emergency spillway and drop structures for flood control. Low-flow crossings, maintenance path, and final channel stabilization.

Lemon Gulch Lookingglass

Developer

Looking Glass

Design Engineer

Muller Engineering Company

Contract Value

$4,971,791

Completion Date

January 2021

Scope Highlights

Channel grading to spread stormwater and reduce degredation. Installation of sculpted drop structures to stabilize grade. Native plantings to restore and enhance riparian habitat.

Green Acres Trib

Developer

MVP Compark Management, LLC.

Design Engineer

Respec

Contract Value

$3,007,709

Completion Date

October 2021

Scope Highlights

Channel realignment to accomodate future development. Box culvert installation at southwest end of project. Cascading concrete drop structure with artisanal log features.

Willow Creek Sterling

Developer

Sterling Ranch Community Authority Board

Design Engineer

ICON Engineering

Contract Value

$1,202,347

Completion Date

February 2022

Scope Highlights

Channel realignment and stabilization with riffle pads and boulder step pools. Soil riprap installation for long-term channel protection. Stream improvements to support development and enhance ecological function.

Lemon Gulch Meadowlark

Developer

Meadowlark by Meritage Homes

Design Engineer

Muller Engineering Company

Contract Value

$1,736,478

Completion Date

August 2023

Scope Highlights

Boulder cascades, sculpted drop structures, and bioengineered bank stabilization. Channel improvements to prevent erosion and support wetland development. Riparian habitat expansion and long-term stream stability.

Sterling Gulch

Developer

Sterling Ranch Community Authority Board

Design Engineer

Matrix Design Group

Contract Value

$2,123,126

Completion Date

January 2021

Scope Highlights

Mass channel grading with overbank depressions, riffles, and VFR features. Excavation and installation of flow spreaders and grade control elements. Coordination of soil preparation for future revegetation and site stabilization.

Willow Creek Rampart

Developer

Sterling Ranch Community Authority Board

Design Engineer

Olsson

Contract Value

$682,993

Completion Date

November 2020

Scope Highlights

Mass grading and realignment of channel corridor. Installation of sculpted concrete drop structure and grade control features. Box culver, storm sewer, and drainage infrastructure improvements.