ABOUT THIS PROJECT

Westminster and MHFD have big plans for streambank stabilization along Big Dry Creek. BDC will be reconstructed between 104th Avenue and Sheridan Boulevard.

This project will include trail extensions and realignments to improve flow and trail access.

Westminster and MHFD have selected a project partnership team to get the job done:

  • Olsson is the design engineer
  • Stream Landscape Architecture is providing landscape architecture services
  • Naranjo is the Civil Constructor
  • Western States Reclamation will be providing the landscape restoration

Westminster has more background information at their project websites:

CLIENT

Mile High Flood District

LOCATION

Westminster, Colorado

WATCH NOW

PROJECT SHOWCASE VIDEO

From a bird’s-eye perspective, you can see the incredible work being carried out by Naranjo Civil Constructors on-site. With a commitment to environmental restoration and construction excellence, our team is transforming the landscape while ensuring the highest standards of quality and sustainability.

VISUALIZE IT

INTERACTIVE CAD OVERLAY

Explore the engineered design seamlessly overlaid onto the most up-to-date, high-resolution drone survey of the project site. This powerful visualization highlights both the precision of our engineering and the accuracy of our aerial data, providing a clear picture of how the design integrates with existing site conditions.

View Now

PROJECT EVOLUTION

Experience the progress first-hand with our interactive image comparison slider. Seamlessly switch between before-and-after views to see the impactful changes made on-site, highlighting the transformation and precision of our work.”

PreCon12/30/2025