ABOUT THIS PROJECT
-
Channel grading and reconstruction to establish a stable creek alignment
-
Installation of riffle grade control structures throughout the project reach
-
Topsoil stripping and replacement to support vegetation establishment
-
Riparian corridor restoration with native seed and plantings
-
Erosion control and BMPs during construction
-
Integration of drainage improvements with the surrounding Parterre subdivision
CLIENT
Mile High Flood District & Parterre Development Team
LOCATION
Thornton, CO

WATCH NOW
PROJECT SHOWCASE VIDEO
From a bird’s-eye perspective, you can see the incredible work being carried out by Naranjo Civil Constructors on-site. With a commitment to environmental restoration and construction excellence, our team is transforming the landscape while ensuring the highest standards of quality and sustainability.
VISUALIZE IT
INTERACTIVE CAD OVERLAY
Explore the engineered design seamlessly overlaid onto the most up-to-date, high-resolution drone survey of the project site. This powerful visualization highlights both the precision of our engineering and the accuracy of our aerial data, providing a clear picture of how the design integrates with existing site conditions.
View CAD Overlay
View Now

PROJECT EVOLUTION
Experience the progress first-hand with our interactive image comparison slider. Seamlessly switch between before-and-after views to see the impactful changes made on-site, highlighting the transformation and precision of our work.”
















